The challenge
A leading UK car manufacturer required advice throughout the design and construction phases to reduce process risk and demonstrate risk to be as low as reasonably practicable (ALARP).
Support at the early stages of the project can highlight areas where risks could be reduced and help inform the design, making it more economical and cost-effective.
The approach
- Workshop with key stakeholders to identify and define credible release scenarios to be considered in the study. Ventilation arrangement and emergency response (including detection system) defined.
- Creation of a 3D geometrical model of the test cell within FLACS.
- Ventilation study to assess the normal operating conditions within the test cell to determine whether ‘dead spots’ may be present. Ventilation air flow was reviewed at various heights, including within the pit volume, to determine whether the accumulation of a hazardous flammable atmosphere in the event of a leak may occur.
- Model credible release scenarios including formation of liquid pools of fuel with subsequent evaporation and dispersion of a flammable vapour cloud.
- Monitor flammable vapour concentration at each of the detector sample points throughout the simulation run time. Detector sample point locations were reviewed to ascertain whether detection would occur prior to a hazardous flammable atmosphere being achieved.
- Model enhanced ventilation conditions triggered on detection of a flammable vapour. Assess the impact of increased ventilation on the dilution of the flammable atmosphere within the test cell.
- Monitor the size of the flammable vapour cloud throughout the simulation run time.

Ventilation modelling allows users to review the flow of air throughout the area considered. Useful for “complex geometries” – where the presence of obstacles and structures may create dead spots in the ventilation domain (areas with limited or no air movement).

Assess the dispersion of vapours including both vapour releases and evaporation of vapours from a liquid pool. Dispersion modelling determines dilution of release and potentially hazardous zone extents, reviews the impact of varying ventilation flow rates and allows optimisation of gas detector system design.
Ventilation

General good ventilation was observed around the location within the main test cell (Figure 3).
Dead spots were identified within the pit volume. At the second detection point, where general ventilation was turned off, the flammable vapour cloud increased.
Dispersion

A series of dispersion scenarios were modelled considering the fuel supply lines (Figure 4).
The outcome
Scenario 1: Release from fuel supply lines into the test cell, which form a pool within a drip tray
- The small release modelled was detected quickly, due to the optimal location of the detector sample point (positioned in proximity to connections on the fuel line).
- Local exhaust ventilation (LEV) in proximity to connections on the fuel line. LEV was provided by ATEX certified fan, which is activated at the first detection set point of 10% LFL (Lower Flammability Limit).
- Enhanced ventilation effectively diluted the flammable vapour cloud.
- The flammable atmosphere remains below the second detection set point (25% LFL).
- Flammable atmosphere (above LFL) localised to drip tray.

Scenario 2: Release from fuel lines within FuelExact box, which forms a pool within a drip tray underneath
- The release was detected quickly, primarily due to the geometry of the FuelExact box above the drip tray creating a channelling effect. This promoted the directional flow of the flammable vapour towards the detector sample point (positioned above the corner of the drip tray).
- The second detection set point (25% LFL) activated almost immediately following release.
- Local exhaust ventilation (LEV) in proximity to the detector sample point activated. LEV was provided by ATEX certified fan.
- Enhanced ventilation controls the dispersion of flammable vapour and flammable atmosphere localised to drip tray.
Scenario 3: Release from the connection on the fuel supply line into the engine, which forms a pool within the sump
- The modelling showed that a small release of fuel, which collects within the sump channel underneath the engine test pallet would not be detected by the proposed detector sample point locations.
- Detector sample points were located within the pit volume and at the test cell ceiling level.
- Flammable atmosphere (>LFL) predicted within sump channel along centreline of test cell pit volume.
- Dedicated ventilation within pit volume (supplied via an ATEX-certified fan) would be activated on detection of 10% LFL within the test cell.
- However flammable release was not detected at any of the detection sample point locations.
- A flammable atmosphere was expected within the pit volume at the back of the test cell (along the adjoining wall with the control room).
- 25% LFL cloud expected within the main test cell volume, which remains undetected.
Benefits for the client
The outcomes of this analysis provided the client with the following information:
- Ventilation performance
- Generally, good ventilation was observed around the main test cell. Dispersion studies determined that some vapour releases were detected promptly and were effectively diluted by the proposed design.
- Dead spot locations
- There were locations within the sump where there was a potential for dead spots. Ventilation configurations to promote effective dilution of the flammable atmosphere were recommended.
- Gas detection optimisation
- Recommendations were provided including a review of the detector sample point locations, to optimise the detection of a release into the sump.
- Design feedback before construction
- Gexcon were able to provide feedback to the client on the design of the facility, prior to construction. Recommendations were based on the analysis of site-specific potential releases, agreed with the client.
- Risk control alignment
- Risk reduction measures were reviewed against the hierarchy of controls, to demonstrate that the risks are as low as reasonably practicable.