The implementation
Simon Chovau, Principal Safety Consultant at CPSAI, discovered the EFFECTS and RISKCURVES software tools through a referral and chose to implement them in his projects due to their significant benefits.
These include a user-friendly interface that excels in GIS analysis, the responsiveness of the software developers to incorporate suggestions for regulatory compliance, as well as flexible and competitive pricing.
Simon often integrates the tools into facility siting studies, as they provide clear, straightforward, and tailor-made advice for his clients. He utilises RISKCURVES for quick results in projects involving state-of-the-art facilities and substances, as well as for high-level assessments.
For newer or more complex scenarios, such as two-phase outflows or lighter-than-air gases, he turns to EFFECTS to delve deeper into the intermediate steps and fine-tune parameters according to specific guidelines.
Despite occasional challenges in project execution, Simon finds that these generally stem from the input into the software rather than from the software itself.
Adjusting input parameters requires deep insight and a critical approach to the results, areas in which he values the expert opinions provided by Gexcon’s software developers as one of the crucial resources he often seeks.
The outcome
Simon informed Gexcon that he has been successfully employing EFFECTS and RISKCURVES in his projects, which have significantly aided companies in making informed decisions regarding building designs and implementing safety measures at various installations.
He highlighted several impactful outcomes, such as one instance where risk assessment results indicated that a building did not require reinforcement against blasts, resulting in substantial cost savings. In another case, the advice provided based on the software results led to a project being relocated further from an office building to enhance safety.
Simon particularly values the ‘Consequence Contours’ feature of these tools, which proves extremely useful in quantifying overpressure effects from gas cloud explosions. This feature assists in defining congested areas and calculating the worst-case scenarios concerning confined explosive masses.
Furthermore, Simon has been impressed with the noticeable improvements in the tools over the past decade. The calculation times for RISKCURVES have significantly decreased, making the process much more efficient. Additionally, more realistic models have been implemented, such as the two-zone pool fire model and the dispersion model for light gases, enhancing the accuracy and reliability of the results.
About CPSAI
CPSAI (Consultancy for Process Safety and Asset Integrity) is dedicated to supporting companies by providing expert advice on safety concerning both people and assets.
Based in Belgium, its primary focus is on quantitative risk assessment (QRA) and detailed consequence modelling, specifically targeting hazardous (Seveso) substances. This expertise extends from gas stations to large projects involving chemical substances.
CPSAI was established by Simon Chovau, an expert in QRA with a PhD and Master’s in Chemical Engineering. He has led significant projects for major chemical companies and conducted pivotal studies on hazardous substances such as LPG, LNG, and hydrogen.
At CPSAI, Simon aims to champion a culture of safety and assume a pivotal executive role within his field of expertise. Simon is widely recognised for his expertise in drafting safety reports and holds certifications in various software tools, including EFFECTS, RISKCURVES, and FLACS from Gexcon.

Simon Chovau, Principal Safety Consultant at CPSAI
“I have conducted several siting studies using EFFECTS and RISKCURVES, which have aided companies in making informed decisions regarding building design, plot layout or implementing additional safety measures where necessary.
One notable result for a company was the conclusion that a building didn’t require specific reinforcement/a blast-proof design, leading to substantial cost savings. In another case, the recommendation was to relocate a project further away from an office building for safety reasons.”

Would you like to know more about EFFECTS and RISKCURVES?
Download a free viewing demo version of EFFECTS and RISKCURVES where you can see results from calculated projects.